Pump Down System, Stabilise & Monitor System’s Performance




Steps to Prepare for the Shutdown Process
Scheduled for non-operational hours
Shutdowns are planned at this time clearly because of the great disruption. The entire process can take a maximum of 10 hours.
Get the dry ice
When the refrigeration is shut down, you will need dry ice to temporarily keep the products cold.
Or store the items in another location.
Transition time
Getting ambient temperature to freezer temperature will take longer than chiller temperature, usually a few hours.